Project
Protect floor with plastic to then make repairs to walls. Paint walls in corridor matchin color and finish.
Place: 1620 I LL Corridor
Client: TF Cornerstone
Projects details: JUNE, 2024
Description of the work done
- Protect floor with plastic.
- Patch damage to walls with joint compound to then sand when dry.
- Prime areas patch to then paint matching color and finish.
- Walls only.
- Be done during the week from 8 to 4
- Remove all trash made at the end of the day.
Previous slide
Next slide
