About Us

We must explain to you how all seds this mistakens idea off denouncing pleasures and praising pain was born and I will give you a completed accounts of the system and expound.

Contact Info

123/A, Miranda City Likaoli Prikano, Dope United States

+0989 7876 9865 9

info@example.com

Project

Lobby Corridor Renovation 10th floor

Place:   1156 Fifteenth Street N.W. Washington, DC 20005

Client:  TF Cornerstone

Project details:  APRIL, 2024

Description of the work done

  • Remove baseboard, repair walls, prime and apply  two coats of SW7004 snowbound super paint satin to walls.
  • Prep and apply two coats of SW 7004 emerald semi-gloss to painted doors/frames.
  • Prep and apply scuffmaster SP11164 metallic paint, satin sealer to four elevator doors/frames.
  • Remove carpet, cement skim prep floor and install new LVT slate tile and vinyl base
  •  Furnish 1063 SQ FT masland calibre wood LVT W 1007 plank, glue, JOHNSONITE 230 L. FT.  4″ vinyl base
  •  Remove and install new 270 ceiling tiles and grid ARMSTRONG 1912A
Previous slide
Next slide

KNOW OUR PROJECTS