Project
Lobby Corridor Renovation 10th floor
Place: 1156 Fifteenth Street N.W. Washington, DC 20005
Client: TF Cornerstone
Project details: APRIL, 2024
Description of the work done
- Remove baseboard, repair walls, prime and apply two coats of SW7004 snowbound super paint satin to walls.
- Prep and apply two coats of SW 7004 emerald semi-gloss to painted doors/frames.
- Prep and apply scuffmaster SP11164 metallic paint, satin sealer to four elevator doors/frames.
- Remove carpet, cement skim prep floor and install new LVT slate tile and vinyl base
- Furnish 1063 SQ FT masland calibre wood LVT W 1007 plank, glue, JOHNSONITE 230 L. FT. 4″ vinyl base
- Remove and install new 270 ceiling tiles and grid ARMSTRONG 1912A